To provide a twenty four hour berthing facility for the tug fleet servicing the Gas Terminal
Design
Solution:
6 Modules of heavy duty pontoon provided135 metres of berthing space. Due to high berthing loads a triple fendering system was used. Pontoon were close linked to give maximum stability